top of page

News

Penge Medical - Revealed

  • Writer: Buxton Bear
    Buxton Bear
  • Apr 4, 2017
  • 1 min read

The scaffolding is being struck at Penge Medical Centre allowing us to complete the external works.


The project involves the construction of a 3 storey steel frame, composite slabs, SFS infill frame and traditional brick and stone work building.

The new centre will be a much needed primary care facility within Penge and will accommodate two General Practice surgeries, a pharmacy and provide clinical/ treatment rooms offering high quality facilities which deliver the range and quality of care that is required of a 21st Century NHS.


The scheme must achieve BREEAM Healthcare excellent rating and comply with NHS Technical Standards.

Client: Haven Health Ltd Architect: C2J Design Ltd QS: Quadrant Surveying Ltd Value: £3.28m Duration: 54 weeks


 
 
bottom of page