Vaulted Ceilings


A high level scaffold crash deck is currently being installed to the Nave at Guildford Cathedral this will allow the removal of acoustic plaster to the vaulted concrete ceiling, re-decoration and installation of 21st century audio, visual and led lighting. At the same time we will be decorating the lime plaster walls and cleaning the Somerset Limestone.

The scaffold deck has been designed to allow full public access to the Cathedral below (pic1)

(pic 2) showing the completion of works to the Santuary.

Client: The Cathedral Church of Holy Spirit Architect: Thomas Ford & Partners PQS: Pierce Hill Consulting LLP Value £4.2m Programme: 57 Weeks